For the 3rd time in the last 12 months, KCCJ have been called upon to assist with the refurbishment of another area of the production kitchen within Leeds’ largest hotel (Dalata Hotel Group - The Clayton Hotel).
A chilled prep area was replaced in 2017 followed by a large dishwash facility. In 2018 the old island cooking suite was removed and replaced with a range of Falcon F900 equipment. At the same time, upgrades to the extraction and supply air systems including new fans were also made.The old suite was literally cut to pieces in order to get it out of the kitchen with alterations to the gas and electrics taking place simultaneously and then the new equipment installed the following day.
Two long days but a great 48 hour transformation….Job Well Done!!